Atkins Tech Solutions

Industries

Low-Voltage Partner for General Contractors

One sub for cabling, cameras, access, and Wi-Fi — phased to your construction schedule with documented handoffs.

Written by Patrick Atkins, founder of Atkins Tech Solutions. Last reviewed August 18, 2026.

What should a GC expect from a low-voltage sub?

A low-voltage sub should hit the rough-in window, coordinate firestop and pathway with other trades, return for trim-out, and hand the owner a labeled, tested system. Atkins Tech Solutions bids that as one scope instead of four vendors.

One low-voltage sub vs four vendors

Comparison table

Combined ATS scopeSplit vendors
Superintendent contactsOneCabling + cameras + access + Wi-Fi
CloseoutOne as-built packageFour incomplete folders
Schedule riskOne trade in the windowWhoever showed up last

Send plans, not a sales paragraph

If the project is already in bid, ATS can work from drawings and specifications. Send the plan set, Division 27/28 scope, addenda, bid date, project address, and known testing/closeout requirements. See commercial capabilities for qualification details.

Send Plans / Request Bid Review

Prequalification

Vendor packet? ATS can provide W-9, COI, project references, and required onboarding documentation for qualified opportunities.

Commercial capabilities

How we support GCs

We work as the low-voltage trade on commercial new construction and tenant improvements — aligning rough-in, pathway design, and trim-out with your superintendent's schedule so you are not chasing multiple subs at punch list.

  • Pre-construction pathway and count review
  • Phased rough-in aligned with build schedule
  • Firestop coordination at rated walls
  • Trim-out, testing, and as-built documentation

Single-trade low-voltage scope

Instead of juggling separate vendors for cabling, cameras, access, and wireless, GCs can scope one coordinated low-voltage contract — fewer coordination meetings, one punch-list contact.

  • Structured cabling and telecom rooms
  • IP camera and NVR systems
  • Access control and door hardware coordination
  • Business Wi-Fi and PoE infrastructure

Documentation that closes out jobs

Every project includes labeled pathways, tested copper runs, and handoff notes your owner and IT team can use — reducing callbacks and closeout delays. Use the structured cabling RFP checklist and commercial low-voltage closeout checklist when you are writing the spec.

Project proof

GC-coordinated field work includes the approximately 200-drop Plymouth Meeting project, a Pocono-region dental office, and a Westchester, NY office and conference room build-out.

Recommended services

FAQ

Frequently asked questions

Can Atkins Tech Solutions sub on our commercial new construction schedule?

Yes. Atkins Tech Solutions regularly works under GCs with phased rough-in and trim-out tied to build milestones in Pennsylvania and Northern New Jersey.

Do you provide as-built documentation?

Yes. Labeled pathways, port maps, and handoff notes are standard on every Atkins Tech Solutions commercial install.

Can one contract cover cabling, cameras, and access?

Yes. Combined low-voltage scope under one sub is one of Atkins Tech Solutions' most common GC project types.

Do you provide drawings for permit packages?

Atkins Tech Solutions provides scope documentation and as-built notes. Coordinate during pre-construction if the AHJ needs low-voltage on the permit set.

How fast do you respond to a bid walkthrough request?

Atkins Tech Solutions responds to quote and bid-walkthrough requests within one business day. A complete bid still needs drawings or a site visit when counts are not on the set.

Are you licensed and insured?

Atkins Tech Solutions holds PA HIC Registration #PA213204 and is fully insured for commercial work. Request a COI for the project. Out-of-state scope is reviewed against applicable state or local licensing requirements.

Where do you sub?

Atkins Tech Solutions subs commercial low-voltage in the Pocono Mountains, Lehigh Valley, Scranton–Wilkes-Barre, Carbon & Monroe corridor, Hazleton area, and Northern New Jersey.

Get started today

Send plans for bid review

Send the plan set, Division 27/28 scope, addenda, bid date, project address, and known testing/closeout requirements.

PA HIC Registration #PA213204 · Commercial Low-Voltage Contractor · Fully Insured · 5.0 Google rating

QuoteCall Now